Development of an 18 hectare site and construction of the layover facility. 3 Buildings constructed to house equipment and operations, installation of 2600 meters of railway track to tie into existing rail lines. Over 11,000 cubic meters of granular material trucked in.
This project includes the construction of the new train layover facility which includes but is not limited to: grading, water mains, sewers, landscaping, concrete, rail track, 3 separate buildings, and development of mechanical, electrical & civil infrastructure.
Development of an 18 hectare site and construction of the layover facility. 3 Buildings constructed to house equipment and operations, installation of 2600 meters of railway track to tie into existing rail lines. Over 11,000 cubic meters of granular material trucked in.
This project includes the construction of the new train layover facility which includes but is not limited to: grading, water mains, sewers, landscaping, concrete, rail track, 3 separate buildings, and development of mechanical, electrical & civil infrastructure.