Construction of a new 1,112 m2, 4 bay Fire Station. Construction was of concrete and masonry design with wood trusses. A second-floor mezzanine is utilized in a portion of the building. Full site servicing was required to prepare lot for municipal service as part of construction.
Construction of a new 1,112 m2, 4 bay Fire Station. Construction was of concrete and masonry design with wood trusses. A second-floor mezzanine is utilized in a portion of the building. Full site servicing was required to prepare lot for municipal service as part of construction.