PROJECT HIGHLIGHTS

Project Info

PROJECT INFO

Construction of a new 1,112 m2, 4 bay Fire Station. Construction was of concrete and masonry design with wood trusses. A second-floor mezzanine is utilized in a portion of the building. Full site servicing was required to prepare lot for municipal service as part of construction.

Construction of a new 1,112 m2, 4 bay Fire Station. Construction was of concrete and masonry design with wood trusses. A second-floor mezzanine is utilized in a portion of the building. Full site servicing was required to prepare lot for municipal service as part of construction.

PROJECT OVERVIEW

  • Fort Erie Fire Department – New Station No. 4
  • The Corporation of the Town of Fort Erie
  • Raimondo & Associates
  • $5.8 million
  • Stipulated Sum
  • 148 Ridge Road South, Ridgeway, Fort Erie, ON