Underground 130,000 litre grey water collection cistern for use in brine production, Post-Disaster Building, Use as a temporary fire station, 200+ kW backup generator, Electric vehicle recharge station, LEED Silver design, 500 tonnes of concrete reinforcement, over 18,000 square meters of granular paving and over 14,000 square meters of asphalt paving.
Construction of a 1,500 square meter sand & salt storage building with brine production equipment, 1,700 square meter operations facility with Fire Station, storage building, fueling station and 4.05 hectare site development. Targeting LEED Silver certification.
Underground 130,000 litre grey water collection cistern for use in brine production, Post-Disaster Building, Use as a temporary fire station, 200+ kW backup generator, Electric vehicle recharge station, LEED Silver design, 500 tonnes of concrete reinforcement, over 18,000 square meters of granular paving and over 14,000 square meters of asphalt paving.
Construction of a 1,500 square meter sand & salt storage building with brine production equipment, 1,700 square meter operations facility with Fire Station, storage building, fueling station and 4.05 hectare site development. Targeting LEED Silver certification.